Why I Choose Defect Elimination
It can be very versatile – one day you’re solving and issue with a machine and the next day you are increasing the quality of your widgets. I choose defect elimination because...
- Tim Rice
- The Defect Elimination Project
A Novel Way to Determine On-Condition Task Intervals
Typically, the frequency of on-condition, or condition based, maintenance tasks is based on some anecdotal or historic precedent or maybe just on the smallest frequency we can perform the work (e.g., weekly or monthly). But with a little bit of information and a few estimates, you can calculate the optimum inspection frequency. This presentation will walk through all the steps for this alternative approach.
- Bill Barto
- RELIABILITY CONNECT
Machine Learning for Electrical Signature Analysis and Remaining Useful Life
In this presentation we will discuss the application of machine learning predictive analytics as part of data collection and continuous monitoring with ESA. Attendees will have a basic understanding of supervised machine learning systems and how they are applied to identify defects and time to failure estimation methods for electric machines, power quality and driven equipment using the motor or generator as the sensor.
- Howard Penrose
- MotorDoc LLC
Power Quality, Safety and Reliability: The Roadmap
This webinar as part of the WOW series will define the linkage between safety and reliability, so organizations of the future will encourage their members to answer the question “who is responsible for reliability and power quality?”
- Alan Ross
- Electric Power Reliability Alliance EPRA
Successful Asset Management System Implementation Approach and Methodology
This webinar will show the roadmap for how to engineer and design the AMS implementation to fulfil the business requirements and support achieving the maintenance excellence goal.
- Ahmed Kotb
- TRANSCO
Turbo Machinery Diagnostic Process Flow Chart
In this webinar, we will learn about data validation, how to collect machine history data, and assessment of the data.
- Salah Attia
- ALS
Designing Safe & Reliable Data Center Electrical Asset Management Programs
Electrical distribution system losses account for 12% of the total energy consumed by the data center. In addition, unscheduled downtime in a data center is now estimated to cost over $8,000 per minute – not to mention the reputational damage to the data center company..
- Martin Robinson
- IRISS Inc.
The Importance of Logistics in Your Reliability & Maintenance Strategy Part 2
This is part two of the two-part webinar that will provide an overview of reliability and maintenance fundamentals and move into the the importance of logistics in a complete reliability and maintenance strategy.